"Improvement of On-site Productivity"
Own this Valuable 96 page Implementation Manual for
only $50.00 u.s. ($70.00 CDN.+ applicable taxes)
© Kerry O'Brien, 1985 through 2003 Manual
All rights reserved. May not be reproduced in any way without written permission from K.E. O'Brien & Associates, Inc.
$50.00 U.S. by cheque or money order payable to
K.E. O'Brien & Associates, Inc.
365 Keewatin Avenue
Toronto, Ontario, Canada
M4P 2A4
DESIGNED TO SAVE YOUR COMPANY MONEY
This manual outlines a proven pre-planning procedure for achieving dramatic increases in on-site productivity. On-site productivity is a contractor's biggest risk area. There is a tremendous potential for improving on-site productivity. The key to improvement is: Pre-Plan every project with the emphasis on Materials Handling and Team Building.
Section one: PRINCIPLES
Productivity in the Field
Introduction
Typical Situation; how much time is spent on productive work?
Improved Situation; the secret to improved productivity
Benefits of Improved Productivity
Productivity and Cost Savings
Administration and Overhead Costs
Lower Trade Contractor Prices
Safety
That Competitive Edge
Materials Handling and Productivity
Materials Handling is the Key Factor
Detailed Materials Handling Systems
Introduction
Major Items/Areas
Purpose
Materials Handling Analysis
Materials Handling Investment
Materials Handling Crew
Site Materials Handling Environment
Introduction
Major Factors
Case Study
Right Materials at the Right Time
Introduction
Schedules
Single Vendor System
Suppliers
Project Pre-Planning
Introduction
Construction's Unique Situation
Typical Construction Planning
Ideal Construction Planning
Pre-Planning Procedure
Team Building
Field-Office Relationship
GC/CM : Trade Contractor Relationship
Project Pre-Planning and Team Building
Articles on Pre-Planning and Materials Handling
Bibliography
Section two: Putting it Into Practice
Introduction
Introduction
Necessary Elements
Adjust to Suit Your Situation
Step 1 Select Project Team ASAP
Checklist Questions
Step 2 Kick-Off Meeting
Introduction
Site Layout and Materials Handling Checklists
Housekeeping and Garbage Removal System
Team Building and General Concerns Checklist
Step 3 Project Site Visit
Step 4 1st Pre-Planning Session
Preparatory Steps
Major Item/Area
Detailed Materials Handling Planning
Concerns re: Achieving Goals
Implementation of Ideas/Solutions
Step 5 GC/Trade Contractor Materials Handling Meeting
Step 6 Pre-Planning Sessions 2, 3, 4
Project Pre-Planning Summary
Menu
1 Day Seminar
Electrical Contractors,
discover what O'Brien Associates accomplished
for Canem Systems Ltd.
Mechanical Contractors,
Fitgerald Contractors Inc. of Shreveport, Louisiana
are sold on the pre-planning approach
General Contractors,
Eight steps to success for Turner Construction
and their sub-contractors